Recent Projects
Work Plan and Proposal Development, Client: Envirocon, Inc.
Green Globe Environmental, Inc. was hired in 2009 and 2010 to assist Envirocon with the preparation of numerous work plans and technical approach methods for several projects and winning bids. Projects/bids included the Pon Pon Project in South Carolina, Hudson Refining Project in Oklahoma, Crab Orchard data review, Yorktown Virginia Project, and several others.
Green Globe Environmental, Inc. was hired in 2010 to develop a unique remote surveying system for a small unmanned dredge. GGE successfully accomplished this mission and was subsequently contracted to collect sludge data for a pilot test for the amendment of 40,000 cubic yards of waste petroleum impacted sludge. GGE compiled the data for submittal to the EPA.

Green Globe Environmental, Inc. was hired in mid 2009 to develop a quality management system for Envirocon’s operations team. The new quality manual and associated Quality Information System is currently being implemented.

Green Globe Environmental, Inc. teamed with Ecocion Inc. in 2008 to provide Spill Prevention,Control and Countermeasures (SPCC) plans to several nationwide gas companies. To date, the team has prepared approximately 200 plans with contracts to develop many more.
Granby – Grand County Airport, Granby, CO, Client: Columbine Hills Concrete
During the summer of 2008, Green Globe Environmental, Inc. built 3D terrain models (Roading and DTM) for use on a Trimble TSC2 data collector and CAT 140M blade with GCS 900 and laser augmentation. Additionally, Green Globe Environmental, Inc. supplied a Trimble robotic total station and training for the site construction layout, composed the SWMP, built all PaveSmart spreadsheets, compiled the as-built topographic exhibits and volumes and acted as the part time site technical project manager. The job finished on time and on budget.
Green Globe Environmental, Inc. has built numerous Digital Terrain Models for use on two Site Vision equipped dozers and the TSC2 for use with a Trimble 770 GPS system, using SCS 900 and Trimble Survey Controller. Additionally, Green Globe Environmental employees went to the site on behalf of Envirocon, Inc. as technical liasons to assist with design change implementation and quantification. The site was formerly a refinery. Envirocon built a site repository, excavated impacted soils, placed the impacted material in the repository and then capped the repository for final closure.